Effective 04/09/2026
Material Fulfillment Enhancement
Material Lists show the status of each line in operations. Starting with "Sent to Operations" then the associated batch number and the status of that batch.
NOTE: This page can be accessed from the project Attachments tab by simply clicking on any attached material list.