Maintaining the BC Connect Project Grid - Project Status Complete.

The Project Grid in BC Connect® software can accumulate a lot of projects over time. Updating project status in this list to Complete or Inactive is one way to keep the system running efficiently. 

mceclip0.png

On the Project Grid double-click the Status cell and choose from the list. This allows you to change projects to the appropriate status. Here it is setting the project to "Complete". This will hide it from the BC Framer® software integration when paired with the settings below. 

Update the Project Grid Status – Quick Tutorial.

This works hand-in-hand with a setting in BC Framer® software to "Hide Inactive Projects". In BC Framer or MiTek Structure, click File > Setup > Program Settings > Settings > Boise Cascade Settings > BC CONNECT® Settings: Hide Inactive Projects. Change this property to "Yes". 

mceclip3.png

You may also make this change on the BC Connect Save As dialog box if you want to see or hide Inactive (Complete) Projects.

If the system has to produce a list of several thousand projects, it will take longer to process and can cause the system to lock up or crash.

Have more questions? Submit a request