BC Connect® software may display a "Hole Validation Failed" note when adding a manual material list. Designers should verify that a hole actually passes BC Calc® software analysis.
However as of spring 2020, you may override the hole validation.
This action allows the material list to ignore validation and should be used with caution.
The hole description will display a warning that the hole has been overridden, and the action will be tracked in the project activity log.